One of our consultants visited an installation in Abild that had been out of operation for 2½ days during maintenance of the grid company’s 60 kV station.

When the installation was re-energised, one of the phases flashed over to earth and the plastic parts of the circuit breaker caught fire. These photos are from before the breaker was replaced.